Filter Results
Related Organization
- Biological and Environmental Systems Science Directorate (26)
- Computing and Computational Sciences Directorate (38)
- Energy Science and Technology Directorate (223)
- Fusion and Fission Energy and Science Directorate (24)
- Isotope Science and Enrichment Directorate (7)
- National Security Sciences Directorate (20)
- Neutron Sciences Directorate (11)
- Physical Sciences Directorate (135)
- User Facilities (27)
- (-) Information Technology Services Directorate (3)
Researcher
- Venugopal K Varma
- Mahabir Bhandari
- Adam Aaron
- Alexander I Kolesnikov
- Annetta Burger
- Bekki Mills
- Carter Christopher
- Chance C Brown
- Charles D Ottinger
- Debraj De
- Gautam Malviya Thakur
- Govindarajan Muralidharan
- James Gaboardi
- Jason Jarnagin
- Jesse McGaha
- John Wenzel
- Kevin Spakes
- Kevin Sparks
- Lilian V Swann
- Liz McBride
- Mark Loguillo
- Mark Provo II
- Matthew B Stone
- Rob Root
- Rose Montgomery
- Sam Hollifield
- Sergey Smolentsev
- Steven J Zinkle
- Thomas R Muth
- Todd Thomas
- Victor Fanelli
- Xiuling Nie
- Yanli Wang
- Ying Yang
- Yutai Kato

Often there are major challenges in developing diverse and complex human mobility metrics systematically and quickly.

The ever-changing cellular communication landscape makes it difficult to identify, map, and localize commercial and private cellular base stations (PCBS).

V-Cr-Ti alloys have been proposed as candidate structural materials in fusion reactor blanket concepts with operation temperatures greater than that for reduced activation ferritic martensitic steels (RAFMs).

Neutron scattering experiments cover a large temperature range in which experimenters want to test their samples.

Fusion reactors need efficient systems to create tritium fuel and handle intense heat and radiation. Traditional liquid metal systems face challenges like high pressure losses and material breakdown in strong magnetic fields.

Neutron beams are used around the world to study materials for various purposes.

The traditional window installation process involves many steps. These are becoming even more complex with newer construction requirements such as installation of windows over exterior continuous insulation walls.

The interface gasket for building envelope is designed to enhance the installation of windows and other objects into building openings.